Finally, the concretor is on site. They were due Monday but had lost a few days due to the past weeks wet weather. They'll be working tomorrow, and hopefully be pouring the slab Tuesday or Wednesday.
There were only a few teething prolbems on site this morning. One were the floor levels, which were quickly rectified. Another was a couple of setout issues. They first set the west side of the house out off the boundary pegs, not the building line pegs. Grrr. Secondly they assumed the east and west sides of the home were the same length and couldn't figure out why they were 90mm out. I can only imagine how much work would have been done before picking up the mistakes if I wasn't there checking everything...
There were only a few teething prolbems on site this morning. One were the floor levels, which were quickly rectified. Another was a couple of setout issues. They first set the west side of the house out off the boundary pegs, not the building line pegs. Grrr. Secondly they assumed the east and west sides of the home were the same length and couldn't figure out why they were 90mm out. I can only imagine how much work would have been done before picking up the mistakes if I wasn't there checking everything...
No comments:
Post a Comment