Bricks cleaned, cabinets started.

Front of house, showing nice clean bricks (other than where the render is going to the brickwork around the three windows):


Close up of bricks and garage door:


Alfresco ceiling complete:


Lounge/theatre (with doors open):


Lounge/theatre (with doors closed). I still need to fit a piece of timber across the top track to cover the track:


Window opposite lounge/theatre overlooking pool area:


Family/rumpus (meals to the right):


Kitchen:


Meals area:


Measl area looking back toward front door. The corner window looks out to the pool area:


Rumpus built in cabinet and bar:


Laundry, with full height cupboards to the left, and benchtop over cupboards to the right. In the middle of the cupboards will be a fold out ironing board (it also spins 180 degrees so it wont get in the way if open).


Pull out laundry hamper:


Walk in robe to master bedroom. On the left is a shoe rack. Still waiting for shevles over, and hanging rails:


One of the kid's bedrooms:



The tiler and painter will start next week. The plumber will finish fit off after Christmas, and the timber floors and carpet will be installed also. The lights and power points will go in after Christmas when the painter has finished, as will the air conditioners. The carpenter will come back to finish the skirtings after the timber floor has been installed, and the kitchen will be installed at this time also.

Then we move into the house......and work on the pool and landscaping.